All Networks Strategic Solutions Incorporated (ANSSI) is a derivative of the company Teledesign Phils. Co. Inc. (TPCI).

ANSSI incorporators being the Management Team behind the Operations Department of TPCI, holding credits to the projects implemented as follows.

TPCI most recent projects worldwide. Through this we have experience with all major telecommunications equipment suppliers.

The following shows the list of our successfully completed projects per area;

 

PHILIPPINES

Huawei Philippines – Smart Modernization Project Phase 1

Feb 2011 – Jan 2012

Survey, Engineering Documentation (TSSR upto Asbuilt), BTS Installation, Testing & Commissioning. 150 sites

 

Huawei Philippines – Globe WIMAX NCR & South Luzon Project

Jul 2008 to Jul 2010

Survey, Engineering Documentation (TSSR upto Asbuilt), DBS Installation, Testing & Commissioning. 105 sites

 

Huawei Philippines – Globe and DMPI – TCSM, BSC & Core Projects

Jun 2008 to Jul 2010

Wimax Core, 3G core, BSC, IPBeacon, VoIP systems

 

ZTE Philippines – Globe NGN Phase 3 & 4 Project

May 2008 to Nov 2009

Survey, Documentation and Installation works of NGN core.

 

ZTE Philippines – DMPI NLTOP & Ceragon

Mar 2009 to Mar 2010

Survey, Documentation and Installation works of Datacom Equipment

Over 300 GSM sites of DMPI phase 6 & 7 Nationwide in 2007, distributed between Ericsson and Huawei;

 

Ericsson Philippines – DMPI Phase 7 Project North Luzon Change-out

Sep 2007 to Oct 2009

Survey, IE Engineering, Implementation, Testing and Commissioning of RBS 2116, 2216 GSM and MiniLink-TN Transmission equipment. 104 GSM sites and 60 transmission hops.

 

Huawei Philippines – DMPI Phase 6B South Luzon Project

Jan 2007 to Oct 2008

Survey, Engineering Documentation (TSSR), Installation works & Commissioning for Huawei BTS (new, change-out and upgrade) & BSC, also includes transmission testing and patching works. 68 sites

 

Huawei Philippines – DMPI NCR Phase 6A Project

Jul 2006 to Oct 2008

Survey, installation, testing and commissioning of Huawei BTS312. 35 sites

 

Ericsson Philippines – DMPI Phase 6A Project VisMin Area

Oct 2006 to Nov 2008

Includes installation, testing & commissioning of RBS2206 GSM and MiniLink-E Transmission Equipment.

 

Ericsson Philippines – DMPI 972 TRU Upgrade

Nov 2006 to Nov 2008

Involves installation, testing and commissioning of additional RBS2206 cabinets, feeders and antenna systems.

 

Huawei Philippines – DMPI BRE Project South Luzon

Mar 2007 to Jul 2007

Handling Installation works of FOTS – Huawei OSN 1500+, 2500 & 3500

 

ARS Telecom – Globe Telecom TRX Upgrade VisMin Area

Nov 2006 to Jul 2007

Involves installation, testing and commissioning of additional TRU for RBS 2106, 2102, 2206 and 2202.

 

DMPI BICOL Expansion Project, Fastem Construction, Inc. Philippines

Apr 2006 to Dec 2007

Teledesign contracted LOS verification and site survey of link-up. Installation, Testing, Commissioning and Integration of MW and BTS for Bicol Region.  

 

AFRICA

HITS AFRICA DEMOCRATIC REPUBLIC OF CONGO / EQUITOREAL GUINEA – MSM

June 2008- Dec 2008

Teledesign provided Project Director resource for the Turn-key roll out of 2G/3g/Wimax networks.

 

PACIFIC

Ericsson – DIGICEL – ERICSSON GSM PROJECT – Papua New Guinea

Sep 2007- Apr 2008

Teledesign provided resources for O&M and Implementation teams performing the installation, testing and commissioning, and integration of Ericsson RBS 2116, 2216 and Mini-Link TN.

Note:

TPCI a subsidiary of Teledesign Engg. Ltd. (Cyprus) was established in 1997 with its business office in Pasig City, Philippines and stopped its business in June 2012 with later the passing-away of its CEO Mr. Tormod Kalseth (Norwegian). It’s President also acting as the Country Manager Mr. Thomas Joseph Enos (American) tom.enos1@aol.com +1 941 475 9948; +1 941 960 5310 can attest to these statements.